<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:wfw="http://wellformedweb.org/CommentAPI/">
	<channel>
		<title>House project update</title>
		<link>https://blogs.lotterypost.com/jap69/2024/5/house_project_update.htm</link>
		<atom:link href="https://www.lotterypost.com/rss/blogcomments/184908" rel="self" type="application/rss+xml" />
		<description>JAP69's Blog: House project update</description>
		<dc:language>en-us</dc:language>
		<generator>Lottery Post RSS Generator</generator>
		<item>
			<title>Comment #1</title>
			<link>https://blogs.lotterypost.com/jap69/2024/5/house_project_update.htm#c262374</link>
			<guid isPermaLink="true">https://blogs.lotterypost.com/jap69/2024/5/house_project_update.htm#c262374</guid>
			<pubDate>Wed, 15 May 2024 14:15:21 GMT</pubDate>
			<dc:creator>CDanaT</dc:creator>
			<description><![CDATA[<p>Busy lil beaver, JAP !!!</p>]]></description>
			<category>CDanaT</category>
		</item>
		<item>
			<title>Original Blog Entry: House project update</title>
			<link>https://blogs.lotterypost.com/jap69/2024/5/house_project_update.htm</link>
			<guid isPermaLink="true">https://blogs.lotterypost.com/jap69/2024/5/house_project_update.htm</guid>
			<pubDate>Wed, 15 May 2024 13:48:03 GMT</pubDate>
			<dc:creator>JAP69</dc:creator>
			<description><![CDATA[<p>Went to Harbor freight on the 5th and purchased a 3 lb hand held sledge, hand held pick axe and 3 concrete chisels that are 3 inches wide.<br /><br />Went to Lowes on the 5th and purchased 8 feet of oak hand rail, 8 feet of 1x4 oak and 6 brackets.<br /><br />I first cut the hand rail and 1x4 to length. One 6 foot and the remaining 2 foot. I stained those wood pieces. Still have the poly to brush on. I want the 1x4 to mount on the wall to the studding. Then mount the brackets on the 1x4 evenly spaced. Can not evenly space the brackets with the stud layout. I do not trust wall mollies to mount the brackets just on the drywall.<br /><br />The past nine days a few hours each day I removed the 34 foot walkway. dug down and buried a lot of the concrete. Topped it off with the dirt I dug out. Took about 30 to 35 hours to do that. Still need about 7 cu ft of top soil. Plus I will need some grass seed. I have a haul away outfit coming tomorrow to haul away the left over concrete chunks. About 1/2 a yard.<br /><br />Now I will move on to putting the poly on the hand rail and mount the hand rail on the hallway walls. 6 foot one side and 2 foot the other side on the short wall.<br /><br />After that I will top off the walkway with top soil and seed it.... &#x5b;&#xa0;<a href="https://blogs.lotterypost.com/jap69/2024/5/house_project_update.htm">More</a>&#xa0;&#x5d;</p>]]></description>
			<category>Blog Entry</category>
			<category>JAP69</category>
			<wfw:comment>https://www.lotterypost.com/blogentry/184908</wfw:comment>
		</item>
	</channel>
</rss>

