JAP69's Blog

ev-od/hi-lo code p-3 wheels

If no one already has this setup I am naming it.

ev-od/hi-lo code p-3 wheels

c
o
d
e] lot #s
1] 13
2] 024
5] 579
6] 68

no match code wheel

________2lo1 1hi___1 ev 2 od
125__015,017,019,125,127,129
_____145,147,149,035,037,039
_____235,237,239,345,347,349

________2lo 1 hi___2 ev 1 od
126__016,018,126,128,146,148
_____036,038,236,238,346,348

________1lo 2 hi___1 ev 2 od
156__156,158,167,178,169,189
_____356,358,367,378,369,389

________1lo 2 hi___2 ev 1 od
256__056,058,067,078,069,089
_____256,258,267,278,269,289
_____456,458,467,478,469,489

double code wheel

________3lo______1 ev 2 od
112__011,013,033,112,114,123
_____134,233,334

________2lo 1 hi______3 od
115__115,117,119,135,137,139
_____335,337,339

________2lo 1 hi___1 ev 2 od
116__116,118,136,138,336,338

________3lo______2 ev 1 od
122__001,012,014,122,124,144
_____003,023,034,223,234,344

________1lo 2 hi______3 od
155__155,157,159,177,179,199
_____355,357,359,377,379,399

________1lo 2 hi___2 ev 1 od
166__166,168,188,366,368,388

________2lo 1 hi___2 ev 1 od
225__005,007,009,025,027,029
_____045,047,049,225,227,229
_____245,247,249,445,447,449

________2lo 1 hi______3 ev
226__006,008,026,028,046,048
_____226,228,246,248,446,448

________1lo 2 hi___1 ev 2 od
255__055,057,059,077,079,099
_____255,257,259,277,279,299
_____455,457,459,477,479,499

________1lo 2 hi______3 ev
266__066,068,088,266,268,288
_____466,468,488

________ 3 hi______1 ev 2 od
556__556,558,567,578,569,589
_____677,778,679,789,699,899

________ 3 hi______2 ev 1 od
566__566,568,588,667,678,788
_____669,689,889

trip code wheels

________3lo______3 od
111__111,113,133,333

________3lo______3 ev
222__000,002,004,022,024
_____044,222,224,244,444

________3 hi______3 od
555__555,557,559,577,579
_____599,777,779,799,999

________3 hi___3 ev
666__666,668,688,888

 

 

 

 

Entry #525

Sunday to do list

Will not be doing much today on floor project.

Need to readjust door stop and door sweep on kitchen door. Just a tad out of placement as door will not latch when swung shut. Do not like to have to push door to snap into strike plate.
Need to install one piece of casing back on kitchen door on laundry side.
Put 2 more coats of poly on door sills and I will let the final coat set for a few days before I install them.

Have a small closet at the end of the the hall about 2 ft x 3 ft that has carpet in it. Have 5 pieces of flooring left from job so I will remove carpet and install the flooring in that. Thats for next Sat.

Will work on my new code later today.

Entry #524

Still on wood floor


Made 5 sills today. Put one coat of poly on.
Spent a fair amount of time on kitchen door to laundry. Had to reshim the jamb side that I mentioned in an earlier blog. Whoever set the door before did not mortise in the keepers on the jamb. Had to do that.
Now I have the same reveal of about 3/16" between the door and jamb. Went to lumber yard and got a new slip on door sweep and installed that. Wanted the door sweep on the door so the sill would not be as high. Trip on em you know. The new sill only is about 1/2" above floor now.

Hey I am really interested in this new code I did.
What a code system is like I have it are wheels. The difference in a code wheel and a regular wheel is that you do not use the numbers that are a code digit as a pair up.
example: you have a wheel by position here which will create 12 plays using 7 numbers.
you see the code 5 here so the prs 57-59-79 will not appear in the list of 12 numbers. The same goes for the 13 and 68 pr

If you used a double code 5 in your code combo number then you will see the 55-77-99-57-59-79 prs in your list of numbers.

______p1__p2__p3
code #1___5____6
________________
lot #__1___5____6
lot #__3___7____8
lot #______9_____

Entry #523

Not much lottery this week

Been busy finishing up the floor in the house. Finished installing the base trim and door casings today. Made one sill for a look see to see if we were going to like it. Yep, thats a go. So I rounded the edges on the rest of the oak trim with the router and applied the stain on the oak that matches the floor. Will finish the other door sills tomorrow and apply the poly finish tomorrow eve and let that dry 24 hours. Needed to let the stain dry 24 hours so that is why I did that tonight.

Did load up the eve draws from Jan 1 with the new code last night as I did not work on floor system last night.
Looks like this final code is the one to go with. Seen some advantages already but will define them later.
Will look at the advantages this weekend maybe.

Entry #522

Wouldyaknow Says I

I entered mid day draw data from Jan1 06 to yesterday last night with the new ev-od-ex code.
was looking at the code prs and the 11 code pr was in a due situation. That is the 11-33-13 prs.
Hmmm says I looks like the 13 pr may just come back I may just play the 136 and 138 combo on mid day here. I did not act on it as I was tired and went to bed.
The 318 came on todays mid.

ev-od-exact code

1] 13
2] 024
5] 579
6] 68

Entry #521

New code ev-od exact [checking]

ev-od exact code

1] 13
2] 024
5] 579
6] 68



I was looking at the mid results from past six months to see what is biased in the groups hll & hhl

Pulled this one out on the hll to take a look to see what is biased as far as eeo etc. Just about what I figured

Even/Odd:
EEE 17 25.8% 822 260 262 406 084 026 620 048 624 064 840 260 602 208 228 840 280

EEO 27 40.9% 481 384 227 621 308 254 063 834 603 094 209 261 472 803 382 722 227 632 823 092 429 483 261 254 106 472 306

EOO 17 25.8% 415 743 417 327 037 741 521 723 118 271 174 833 453 129 318 251 453

OOO 5 7.6% 913 371 319 911 335

Now lets take a look at the hhl.

This is something I never checked before as far as bias on hll and hhl

Even/Odd:
 EEE23.6%684 884
 EEO1832.1%186 186 760 654 838 827 186 807 694 186 894 188 874 526 580 782 508 728
 EOO2850.0%079 925 554 963 275 745 398 459 916 839 839 727 947 189 099 059 554 497 949 583 165 716 505 156 259 925 495 961
 OOO814.3%773 773 973 197 375 379 155 359

Entry #520

Floor is done

Worked till about 7 pm Sun eve and quit. Had about 40 more square feet to do.

Done that tonight as I had more baseboard to take off before I could finish the rest of the 40 Sq feet. Put some baseboard back down last night in the kitchen area so I would not have to pull fridge out again. Put some more base down where I finished tonight tp put some things back in place without dragging them out again.

Still have that jamb to put back in and casing on the doors to put back. Plus I still need to make my door sills to terminate to carpet in bedrooms and from dining room to licing room.

Think I will wait till weekend for rest of it but may denail the trim during the eve hours till the weekend.

Took about 22 hours to do what I did so far to lay the 300 sq feet.

Entry #519

Change again on the new one

Well I got to thinkin today about that new ev-od exact code. Well I says to me why dont you change the 135 and the 79. yep says me to I. And while we are at it we [thats Me And I by the way] Change the code numbers to two low numbers and two high numbers. Well says He [He walked in later by the way] Now you all got your ev-ods plus you have the high and lows separated. Our software tracks ev-od and high and low.

first stage the code.

ev-od exact

1] 135_____ 2 ll__1 h
2] 024___all lll
3] 79____all hh
4] 68____all hh

second stage the code modification.

ev-od exact

1] 13____all ll
2] 024___all lll
5] 579___all hh
6] 68____all hh

Entry #517

Ev-od exact example smackdown box hit

 

Just a random guess for an example. Was not exact though>LOL<

Did not play the lottery today. Too busy

621 Sun eve 4/23

example

_______p1__p2__p3
code____2___1___4
_________________
lott_____0___1___6
lott_____2___3___8
lott_____4___5____

016,018,036,038,056,058
216,218,236,238,256,258
416,418,436,438,456,458

Entry #516

Another code system [ev-od exact]

Thought of this one this am.

The primary search will be for exact order plays. Non exact will give me from 8 to 27 combos to work with.


Exact order code tracking has piqued my interest as exact code pairs seem to be a workable deal.
I already have the ev-od code but going to tighten it up a bit. See what it looks like after I do data entry at a later time when I am done with my floor system.

first stage the code.

ev-od exact

1] 135_____ 2 ll__1 h
2] 024___all lll
3] 79____all hh
4] 68____all hh

So this code will give exact order plays from 8 to 27 exact plays for every 3 digit code.

example

_______p1__p2__p3
code____2___1___4
_________________
lott_____0___1___6
lott_____2___3___8
lott_____4___5____

016,018,036,038,056,058
216,218,236,238,256,258
416,418,436,438,456,458



Entry #515

Checking race results tomorrow


I was an avid spectator at dirt tracks in the notheast for many years. Wanted to build a racer of my own but that is an expensive hobby.

Used to go to Fonda speedway in the 50s when I was a kid. Anyone from N.Y. remember Pete corey, Jeep Herbert, Steve Danish to name a few.
The roar of engines the smell of high octane fuel, The ontrack fist fights,>LOL<

Lebanon Valley speedway is a super fast 1/2 mile high banked dirt track. They come of turn 2 and 3 and do up to 120 mph down the backstraight and the front straight. Wicked good racin.

Leb Valley speedway has about a 5 foot hight steel plate wall backed up with dirt around the outside of the track. Seen more that one racer get caught up in the loose dirt and climb that wall.

Read last weeks results and someone took a wild ride down the front straight.

http://www.dirtmotorsports.com/corp/

Entry #514

Done for today on it

Got what I wanted done around 8 pm.

Done the hall area and 2/3 rds of the dining area.

The hall area is l shaped with 5 doors in it. so that took a bit of time.

The dining area and the kitchen area is an open space divided by an 8 or 9 foot cabinet pennisula with cabs above. I am up to the end of the pennisula cabinets. So i will run a row to the wall to end of kitchen and stop. Then I will need to start back on the inner wall and come forward to the extended row. Get a close as possible setback measure to the inner wall to start. When I come up to the extended row and my measure is of a tad I can pull the free floating floor forwards or push back just a tad to get the interlock to match up.

Had a similar deal on the hall where I had to setback 64" and come forward to tie in to the run that came from the dining area and continued into the hall to the end. That worked out as I only had to pull the 64" setback forward 1/8".  Must have moved while working on it.

At it again tomorrow. will have the easy runs to do. Cut and go. Git-r-dun.

Entry #513

Busy weekend this weekend

Going to install 300 square feet of free floating interlocking flooring.

Will be doing the kitchen, dining room and the hallway to the bedroom doors.

I only work 1/2 day fridays so I started on it this afternnon.

Houses in this area are constructed on concrete slabs. The area mentioned has vinyl flooring on it. The instructions say to remove the shoe moulding and to undercut the door jambs and trim.

I removed the shoe mould as well as the baseboard and the door casing. I also removed one jamb set as it did not have a door in it. I then undercut the rest of the jambs into the door jamb about 1". Trying to interlock the flooring is difficult when trying to slide it under the door trim and jamb. Should be able to manage sliding the flooring into the undercut jambs as those jambs are where I butt the end of the flooring into. Just lock it together and push it under the jamb. Going to put a threshold in each opening where it goes to the carpet. Need to overlap the threshold onto the interlocking flooring about 1/2". This will give a finshed appearance from flooring to carpet.

It is not recommended to put this flooring over humps in the floor or try to bridge low spots otherwise it will move up and down when walking on it. I have a couple high spots to take out to get rid of the low spots on each side of the hump. Took out one spot this afternoon.

Will work on it again tomorrow.

Entry #511