- Home
- Premium Memberships
- Lottery Results
- Forums
- Predictions
- Lottery Post Videos
- News
- Search Drawings
- Search Lottery Post
- Lottery Systems
- Lottery Charts
- Lottery Wheels
- Worldwide Jackpots
- Quick Picks
- On This Day in History
- Blogs
- Online Games
- Premium Features
- Contact Us
- Whitelist Lottery Post
- Rules
- Lottery Book Store
- Lottery Post Gift Shop
The time is now 4:58 pm
You last visited
June 5, 2026, 12:00 pm
All times shown are
Eastern Time (GMT-5:00)
House project update
Published:
Went to Harbor freight on the 5th and purchased a 3 lb hand held sledge, hand held pick axe and 3 concrete chisels that are 3 inches wide.
Went to Lowes on the 5th and purchased 8 feet of oak hand rail, 8 feet of 1x4 oak and 6 brackets.
I first cut the hand rail and 1x4 to length. One 6 foot and the remaining 2 foot. I stained those wood pieces. Still have the poly to brush on. I want the 1x4 to mount on the wall to the studding. Then mount the brackets on the 1x4 evenly spaced. Can not evenly space the brackets with the stud layout. I do not trust wall mollies to mount the brackets just on the drywall.
The past nine days a few hours each day I removed the 34 foot walkway. dug down and buried a lot of the concrete. Topped it off with the dirt I dug out. Took about 30 to 35 hours to do that. Still need about 7 cu ft of top soil. Plus I will need some grass seed. I have a haul away outfit coming tomorrow to haul away the left over concrete chunks. About 1/2 a yard.
Now I will move on to putting the poly on the hand rail and mount the hand rail on the hallway walls. 6 foot one side and 2 foot the other side on the short wall.
After that I will top off the walkway with top soil and seed it.

Comments
Post a Comment
Please Log In
To use this feature you must be logged into your Lottery Post account.
Not a member yet?
If you don't yet have a Lottery Post account, it's simple and free to create one! Just tap the Register button and after a quick process you'll be part of our lottery community.
Register