Bath remo update

Published:

Working on hall bath yet. Already removed toilet, removed bottom portion of vanity leaving top portion there to have use of wash bowl,  scraped the adhesive off floor, poured self leveler, opened up wall and assembled and installed cabinet, filled back in drywall around cabinet edges and applied joint compound and sanded.

What is left to do. Install flooring, install flooring sills on two door openings, elevate toilet flange, put baseboard and shoe molding back on sealing the perimeter of flooring with silicone caulk, apply trim on new cabinet edges, install new toilet, Touch up paint around new cabinet, remove top, portion of vanity, install new vanity with new vanity top and wash bowl, reconnect vanity plumbing, 

Then do a final punch out and be done with it. 

New toilet in other bath room has not plugged since started using two flush system. # 2 then  flush, wipe then flush.

Entry #5,781

Comments

This Blog entry currently has no comments.

Post a Comment

Please Log In

To use this feature you must be logged into your Lottery Post account.

Not a member yet?

If you don't yet have a Lottery Post account, it's simple and free to create one! Just tap the Register button and after a quick process you'll be part of our lottery community.

Register