Welcome Guest
( Log In | Register )
The time is now 11:38 pm
You last visited May 26, 2022, 10:02 pm
All times shown are
Eastern Time (GMT-5:00)

Done for today on it

Published:

Got what I wanted done around 8 pm.

Done the hall area and 2/3 rds of the dining area.

The hall area is l shaped with 5 doors in it. so that took a bit of time.

The dining area and the kitchen area is an open space divided by an 8 or 9 foot cabinet pennisula with cabs above. I am up to the end of the pennisula cabinets. So i will run a row to the wall to end of kitchen and stop. Then I will need to start back on the inner wall and come forward to the extended row. Get a close as possible setback measure to the inner wall to start. When I come up to the extended row and my measure is of a tad I can pull the free floating floor forwards or push back just a tad to get the interlock to match up.

Had a similar deal on the hall where I had to setback 64" and come forward to tie in to the run that came from the dining area and continued into the hall to the end. That worked out as I only had to pull the 64" setback forward 1/8".  Must have moved while working on it.

At it again tomorrow. will have the easy runs to do. Cut and go. Git-r-dun.

Entry #513

Comments

This Blog entry currently has no comments.

You must be a Lottery Post member to post comments to a Blog.

Register for a FREE membership, or if you're already a member please Log In.