Welcome Guest
( Log In | Register )
The time is now 3:31 pm
You last visited May 20, 2022, 3:21 pm
All times shown are
Eastern Time (GMT-5:00)

Sunday to do list

Published:

Will not be doing much today on floor project.

Need to readjust door stop and door sweep on kitchen door. Just a tad out of placement as door will not latch when swung shut. Do not like to have to push door to snap into strike plate.
Need to install one piece of casing back on kitchen door on laundry side.
Put 2 more coats of poly on door sills and I will let the final coat set for a few days before I install them.

Have a small closet at the end of the the hall about 2 ft x 3 ft that has carpet in it. Have 5 pieces of flooring left from job so I will remove carpet and install the flooring in that. Thats for next Sat.

Will work on my new code later today.

Entry #524

Comments

1.
JAP69Comment by JAP69 - April 30, 2006, 3:41 pm
Got That stuff done except for the final coat of poly on the sills. Will do final coat about 6:30 when 2nd coat is dry. That is only about a 15 min job to poly.
I also had to make another sill for the closet I am doing next Sat. Had a piece of oak left for that.

You must be a Lottery Post member to post comments to a Blog.

Register for a FREE membership, or if you're already a member please Log In.